(A). The components used in the building we shipped from various

parts of the world:

 

  • AHU, Chillers & BMS System from TRANE, China & Malaysia.
  • Schindlers Elevators from China
  • Cafeteria Furniture from Steeline Malaysia
  • Electrical components from various parts of India

To name a few clearly indicates the eclectic search for excellence across the globe.

(B) A.C SYSTEM:

  • Energy efficient Centralized Water Cooled Chillers supplied by TRANE
  • Use of Variable Frequency Drives (VFD) for Secondary Chilled Water Circuit and Air handling units for Energy Saving.
  • Maintaining good indoor air quality (IAQ)
  • Heat Recovery Wheels (ERV) from Exhaust / Return air for each floor plate for operational efficiency.
  • Facility of Chilled water metering at each Air handling unit (BTU meters to be provided at each AHU / FCU to control the BMS as well as to generate Electronic Billing). (AHU supplied by TRANE).
  • Chilled water circuits for each Tower for better availability.
  • Integrated Building Automation System for faultless operation

(C) ELECTRICAL POWER:

  • 33KV substation Power Supply with Dry Type Transformer 2250 KVA with On-load Tap Changers rating each through incoming feeders from UP State Electricity Board Supply grid
  • All Major Plant rooms including HV Switch Room and Chiller Control Equipment located in service block away from the Main building to avoid electromagnetic / radio interference.
  • The main LV Distribution system will supply 433 V Power by Rising mains floor wise at terminal location with metering facility on line
  • HV bulk metering
  • Individual metering will be provided through Building management system for monitoring kWhr, KW and KVA and KVAr power consumption.
  • All Capacitors are being provided with Harmonic Filters to avoid distortion in Voltage i.e Clean Power will be available to Tenants.
  • Automatic protection of all electrical equipments through selective automatic protection relaying systems.
  • Provision of SDF room interconnected for redundancy would be provided.
  • Risers will be provided to house cable risers and intermediate distribution frames (IDF) for telephone etc. provision for broadband and fiber optics.
  • 100% Power Backup by DG’s of suitable rating for Power, Lighting , Utilities and air-conditioning equipment
  • For 100% back up load, Auto Synchronization with load management by PLC backed by manual synchronization, relays as well.
  • Running of PLC system and power monitoring shall be suitable for Building Automation / Building management.

(D) Building Management System:

BMS can handle Air-conditioning, electrical, Diesel genset, Fire detection, & every aspect of the building services. It can dynamically control the working environment and even sense the light level to switch on or switch off the lights.

  • Security System:
    • Access Control at Ground Level & other important points.
    • CCTV Surveillance at strategic locations
  • Fire Protection System: The FPS will include:
    • Automatic Sprinkler System (One-layer sprinkler system)
    • Wet riser system
    • External Hydrant system
    • Hose reel system
    • Automatic fire detection and alarm system
    • Emergency voice communication system
    • Portable Fire extinguisher and equipment\
  • Public Address (PA) / Emergency Voice Communication (EVC) / Background Music System (BMS):
    • The Communication system to be located in the main Command Centre with facility for PA at all floors.
    • Two-way / emergency voice communication for use during emergency.

(E) Eco-friendly & Zero discharge Management

  • Soil and Waste drainage will be discharged to Sewage Treatment Plant.
  • Recycling of water from STP for Horticulture / gardening and cooling tower of HVAC/DG
  • Rain water Harvesting is planned.
  • Sewerage Treatment Plant (STP) is designed based on SAFF (Submerged Aerated Fixed Film Reactor) Technology to prevent bad odour and nuisance

(F) Lifts

  • 7 High speed / Lifts in each Tower – 20 Passenger capacity

(G) Green Building

  • Most of the features of Green Building are being incorporated in the project.

(H) Facade & Windows

  • Facade Glass6mm Toughened Solar control Glass having U-value as per Ashray standards.
  • Insulated windowsDouble Glazed windows with 6 mm Solar control Glass and 6 mm Plain glass
 
   
copyright 2006 - 2008 www.logixcyberpark.com
Powered By : SUNSHINE